RE:Production?I went to the special meeting on the 29 of April and visited the assembling plan. I watched workers
putting bolts and screws on the plane. I was a bit surprised and disappointed at the rate they worked.
They checked and looked and run back and forth before they put the bolt in. By the time I left after 5 to ten minute they still checking on the instruction manual. They are supposed to produce 12 planes
by month ( assemble different parts already made ). They have to work faster. They have to
work at a speed as the Ford Model T if they wanted to produce 30 planes a month. I am not critizising the workers. They should be well prepared andhave a full knowledge to put each part to assemble, no hesitation, no looking up for the manual, just do it. I wish they will improve the production. I am still the shareholder of this company. I want Bombardier to be successful. I always
give my full support every move they make, however no reverse split on my shares. I would like to
see I still hold 75000 shares instead of 3750 shares.