RE:RE:RE:from moly to gold in BC
RE:RE:RE:from moly to gold in BCBoys boys boys.................its not about trucks and or pup trailers behind...............it's all about cost to haul 1 ton/kilometre..............and its about blending the ore at Barry close to 2 grams per ton.........capacity of the haul road, maximum load tonnage possible per trip, contract on site mining and haulage at the cheapest bidded price,..................all about design capacity at the mill / day............the rest is pure clutter........get with the way the world works today.....contract/excavate/load/travel/dump/stockpile/mill/dore bars to sell.....AISC at the lowest possible denominator....and rejig as you go to bring the AISC even lower.......so take a break boys and talk over the phone cause you are cluttering up this board with Xmas wishes and really nothing of substantial info.....Later