Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Fission Uranium Corp T.FCU

Alternate Symbol(s):  FCUUF

Fission Uranium Corp. is a Canada-based uranium company and the owner/developer of the high-grade, near-surface Triple R uranium deposit. The Company is the 100% owner of the Patterson Lake South uranium property. Its Patterson Lake South (PLS) project, which hosts the Triple R deposit, a large, high-grade and near-surface uranium deposit that occurs within a 3.18 kilometers (km) mineralized trend along the Patterson Lake Conductive Corridor. The property comprises over 17 contiguous claims totaling 31,039 hectares and is located geographically in the south-west margin of Saskatchewan’s Athabasca Basin. Additionally, the Company has the West Cluff property comprising three claims totaling approximately 11,148-hectares and the La Rocque property comprising two claims totaling over 959 hectares in the western Athabasca Basin region of northern Saskatchewan. The La Rocque property is prospective for high-grade uranium and is located five km south of Cameco’s La Rocque Uranium Zone.


TSX:FCU - Post by User

Bullboard Posts
Comment by Born2Struggle2on Jul 20, 2016 10:43am
109 Views
Post# 25068479

RE:Slurry Wall Builder Vid

RE:Slurry Wall Builder VidTHAT IS COOL. Been wondering about that.

As well, I was wondering about these comments as of late regarding saturated sand - gravel 60m thick overburden being an issue ashore.

Had a look yesterday at the Victor open pit diamond mine in northern Ontario to see what the parameters were for mining. If I read things correctly the overburden at that site consists of muskeg overlaying silt and clays. The pit is protected by a ditch taking care of surface water and 40 - 41cm wells drilled to the mudstone (basement under the overburden?) 220 metres down arounf the pit.

So I infer from that info that DeBeers is dealing with a saturated overburden depth of 200m successfully and taking care of 60m at PLS should be doable.

Pulled this from the Compreshensive Environmental Assessment Report fpr the Victor Mine - googled.

B2S2


Bullboard Posts