OTCQX:NTTHF - Post by User
Post by
MurrayMacon Jul 22, 2016 9:13am
262 Views
Post# 25075226
Excerpts from the Technical Report....
Excerpts from the Technical Report.... S17 – INTERPRETATION AND CONCLUSIONS
The exploration work conducted to date for the 3Q Project is preliminary. To date, no drilling has been conducted for the Project. Consequently, it is not possible to develop Resource or Reserve Estimates with the existing dataset. Two zones of primary interest within the 3Q Project were identified based on surface and shallow sampling results. Specifically, they include areas where sampling indicated the presence of lithium at or above 410 mg/L. This concentration was qualitatively identified as being sufficiently elevated to be of interest for subsequent exploration.
Sampling results from these two Zones indicate that the lithium and potassium grades, and the levels of impurities, compare favourably against other deposits. Additional information is required to determine whether these surface brine distributions extend to adequate depths to be of economic importance.