DH 16-08Now one has to wonder how thick the Debris flow is that 16-08 was drilled in. Either a few vertical or Perpendicular holes need to be placed so that we can get an idea as to how much high grade material is in that cross section and also figure out if the hole is running parallel to a narrow or wide bed. I am sure they are looking forward to figuring out the structural context of the deposit.