OTCPK:MEAOD - Post by User
Post by
fruitvale3067on Sep 11, 2016 8:12pm
143 Views
Post# 25226777
Old Barry estimate
Old Barry estimate https://www.kitco.com/pr/1768/article_10302007114056.pdf
I believe this is with a concentrator. The main problem with the concentrator was cost to run power to the Barry site, which is not mentoned in this piece. Another issue mentioned in this article was waste overburden.