RE:RE:RE:RE:RE:NewsOLD advice from a guy that knows the ins and outs @ carolin.....The initial 2,000 feet of northward drilling will cost about $60,000 and will investigate the area between holes 966-1 and 966-3. By swinging the drill to the north, the area north to lOOON can be reached from the 966N - 800 level drill site. The drifting program will require a minimum of 600 feet of a exploration-sized opening and a minimum of 5,000 feet of drilling. The cost of such a program will be around $400,000 to $500,000 (see cost estimate). The objective would be to initially track No. 1 Zone to the north to find a new major ore body either above or below 800 level and north of 1000N