Further on NAV / AALSuccessful brine drilling tied onto their Glory project (w/PE) and successful brine drilling tied onto their Dean project (AAL). Link to NR: */ (p.s. I dont own either of the 2, but keep an eye on all results in the area.) */ Nevada Sunrise and Advantage Lithium intersect 387.69 metres averaging 243.66 mg/l lithium in brines at Clayton NE Project */ VANCOUVER, BC - Dec. 21, 2016 - Nevada Sunrise Gold Corporation (v.NEV) and its exploration partner, Advantage Lithium Corp. (v.AAL) are pleased to announce the best lithium brine drilling results to date from the 3rd borehole of the 2016 drilling program at the Clayton NE lithium project in the Clayton Valley, Nevada. This follows successful results from the 1st and 2nd boreholes (see Nevada Sunrise NRs dated November 1, 2016, and December 5, 2016). Clayton NE borders the Silver Peak mine operated by Albemarle Corporation (NYSE: ALB), North America's only producing lithium mine. Hole CNE-16-03, drilled to a total depth of 591.3 metres (1,940 feet) has intersected multiple aquifer formations, including 387.69 metres of brine-producing strata averaging 243.66 milligrams per litre ("mg/l") lithium from a depth of 209.23 to 596.92 metres, including a higher grade interval averaging 299.5 mg/l lithium over 36.92 metres. */ "Our 3rd borehole at Clayton NE has provided the highest lithium concentrations of the 2016 drilling program," said Warren Stanyer, President and CEO of Nevada Sunrise. "Our exploration team has successfully drilled one of the deepest boreholes in the Clayton Valley and as a result may have intersected a previously-untapped aquifer system." */ */ https://www.stockhouse.com/news/press-releases/2016/12/21/nevada-sunrise-and-advantage-lithium-intersect-387-69-metres-averaging-243-66