RE:RE:RE:RE:Impressive NewsTad, your wrote:
“As per Dynasty Goldfields EIS …. (no longer available online for some reason)
Assuming maximum transportation cost $450 per truckload
Assuming 25 tonne truck for transportation.
Assuming $30 per tonne processing cost.
Assuming $5.00 per tonne Administration costs
Assuming 20% dilution in resource grade from waste rock
Assuming Green Oil pay full costs of development and mining
Assuming Proportional Transportation and Mining Costs
$450 X 65% DMM share = $292.50 per truck / 25 tonne = $11.70 per tonne
$30 per tonne processing cost X 65% DMM share = $19.50 per tonne
DMM’s 65% share of transportation and processing cost = $31.20 per tonne DMM administration per tonne = $5.00 + $31.20 = $36.20
DMM costs per tonne $36.20
Read more at
https://www.stockhouse.com/companies/bullboard?symbol=t.dmm&postid=25686692#oexzic99rZeb7RKG.99”
Correct me if I’m wrong, but Green Oil responsible for the full cost mining, and of transportation of the ore to the mill.