RE:RE:RE:RE:RE:RE:Extended Deep DrillingTomG
Thanks. From the link below, the "P" shears (4 lines are drawn) coming from Sigma must have met the pilot hole which is coming down from the right and curving down to "common" area below 1100m and 1800m. These P shears are similar to the C-Zones in Triangle. Hopefully, they are as thick as the C-Zones.
https://www.integragold.com/i/pdf/Lamaque-Deeps.pdf
GH