Trucking of Barry Ore
Trucking of Barry Ore
Sectornewswire excerpt page 5: Transportation. This represents a significant cost associated with trucking material from the mine site to the mill, located just over 100km away by road. MTO is considering a road upgrade to accommodate road train from 80 to 100 tonnes. In the past, we understand that 50 tonne trucks were used, thus it may be possible to dramatically reduce haulage costs.