Athabasca Basin Exploration UpdateFor those that don't receive .... Highlights: The Upper Spitfire zone has been extended 40 metres to the northeast of the HK16-53 high-grade intercept by drill hole HK16- 55, and 75 metres to the southwest by drill hole HK17-60 for a total confirmed strike length of 115 metres. HK16-55 has returned assay results of 2.92 per cent U3O8 over 9.5 metres and includes 13.3 per cent U3O8 over 1.5 metres. HK16-60 intersected 12.7 metres of uranium mineralization and contains a 1.9-metre high-grade interval. Seven holes representing 2,526 metres have been completed so far during this program. Assays are pending on the additional six holes completed and reviewed in January. The 2016/2017 winter program is scheduled to complete 30 holes or approximately 12,000 metres of drilling.