IdeallyIdeally you need to have everything flowing in succession . Pads and lease roads being built. As a pad is completed the drill rig moves in. After the rig completes frac moves in. Rig moves on to next completed pad. Pipe and plant chase the frac. A continuing increase cash flow follows. Without the critical mass of cash organic growth is impossible. 12 wells plus the six could set growth on a perpetual path.