GREY:PGDIF - Post by User
Post by
Kidlapikon Mar 13, 2017 10:20am
167 Views
Post# 25970585
CH-6 Underground expansion potential
CH-6 Underground expansion potential
The previous estimates for CH-6 from 260m-380m depth called for an estimated tonnage increase of between 2.15 to 3.49-million-tonnes. As the drilling results show the resource is open at depth and the wall angle is roughly a straight shot, 90 degrees, lets double that and we are looking at: 4.3 to 6.98-million-tonnes at 2.45carats per or 10-17MILLION carats. Using the WWW valuation of $188US/carat that is an in situ increase of between $1.98-3.22US-BILLION in just one pipe....