RE:This seems significant
RE:This seems significant Harte has also referred to a mill rate of 485 tpd based on Stantecs design and then there is the Halyard design parameter. I feel the 550 tpd is a maxiumum design capacity whereas the Stantec number is based on the intial mine supply rate for Phase 1. My feeling is as we approach the end of 2018 the mine rate will be boosted to feed the mill at 550 tpd