RE:RE:RE:RE:Technical Drilling Underway - PAK LithiumAlso the PAK deposit is open to the NW, SE and to depth. This deposit could be 2 times, 5 times, 10 times or more larger than the 8 million tons drilled to date. So the $8 CDN per share NPV is just for the tons drilled to date and will be many multiples larger with additional drilling. Also the Pre-feasibility NPV coming out in the next couple of months will only be for producing concentrate and doesn't even consider the probability of a future hydromet plant to further process the $1000 per ton concentrate into $20,000 per ton battery grade lithium.