Drill Program Now I’m not sure of my math is right here but does this make sense?
(strike Length) 110M + 90M ridge +150 = 350 meters And a “down dip distance” of 90 meters… so 350x90=31500 square meters which is 3.15 hectares
Or is the calculation based upon just 110x90=9900 which is pretty much 1 Hectare.
The “drill program” identified 110 meters of strike length with a further 90 meters exposed along the ridge. Zeolite rubble to the south of Bromley Creek was observed for a further 150 meters yielding a total length of 350 meters. Drilling tested the zeolite horizon along a down dip distance of 90 meters with the zeolite horizon still open down dip.
So of the total 30.8 Hectares, The tonnage is based upon these numbers which is either 1 or 3.15 hectares.