GREY:ALXDF - Post by User
Post by
production05on May 18, 2017 2:36am
254 Views
Post# 26258377
CEO, Eric Owens interview - May 15/17
CEO, Eric Owens interview - May 15/17He is visualizing that something like a 2 km stretch of open pit mineralization (within 250m of surface) could carry something like 1.5 to 2.0 milliion (open pit) ounces of gold at Orenada - for the first resource calculation attempt (not including below 250m depth - in the underground, and along open-pit strike beyond the 2 km). He thinks that something like this could be valuable, especially given the Val d`Or location. He will begin drilling beyond the 2k once the first resource calculations are done.
https://www.azx.ca/media-interviews/