2 holes - SEDAR SRJ stated two DISTINCT drill targets as disclosed in a news release on December 2016. Gravity maps and sampling located these prime drill areas. Interesting to me that the main aquifer zone to be located via drill bore is at 600 and 700 feet even thought the higher grades lithium aquifer find by the nearby PE 8 hole is much deeper. Does anyone understand SRJ's reasoning on this? Thanks Lith for the information connecting Frank G with share purchase and timng. Much more work is needed on LIX claims. CYP believes the brine at deep from hole 8 must continue on their Glory properrty as they speak to the fact that PE has data for such reasoning on the front part of the Glory property CYP and PE control. Chess play seems up in the air - which way for SRJ to proceed after clearing up ownership and permit requirments. Its probably good to feel that SRJ at the very least as an option to raise funds or secure drilling via PE. My driver is that the technical reports from PE may be of some advantage.