Knick completes phase 2 drilling at Trecesson-Cossette
Knick completes phase 2 drilling at Trecesson-Cossette
2017-06-13 02:55 ET - News Release
Mr. Jacques Brunelle reports
PHASE II DRILLING AT THE TRECESSON PROPERTY-COSSETTE GOLD SYSTEM AREA COMPLETED
Knick Exploration Inc. has completed the phase 2 drilling on its Trecesson property-Cossette gold system area. A total of 33 holes have been cored for a total of 3,203.6 meters drilled. Logging and sampling of the core is ongoing.
The property is located approximately 80 kilometers north and 10 kilometers northwest of the cities of Val D'Or and Amos, Quebec, Canada, respectively.
Results from Knick's 2011 first phase of drilling gold highlights included: 14.22g/t over 3.80m (0.415oz/ton over 12.46ft), 22.69g/t over 1.95m (0.663oz/ton over 6.4ft) and 22.86g/t over 1.55m (0.667oz/ton over 5.08ft), all core widths are down hole widths. These results were previously reported along with others in Knick's news release of Aug. 16, 2011. In 2011 the Cossette Gold System of more than 860m potential strike length was drill tested on the south and north Cossette veins covering a strike length of 360m.
Samples are being sent to Expert Laboratory in Rouyn-Noranda, Quebec for analysis. Fire assay and metallic sieve methods are being implemented for analysis as deemed warranted . Due to the nature of the native gold mineralization occurring on the Trecesson Property , Metallic Sieve gold analysis is being performed on all quartz veining to minimize "nugget effect" results and more accurately assess gold grades. References are available on Knick's website at : www.knick.ca
Gordon N. Henriksen, P. Geo., Vice President of Knick Exploration, is the Company's qualified person as defined by National Instrument 43-101. He has reviewed and approved the contents of this press release.
We seek Safe Harbor.