RE:RE:RE:RE:RE:RE:RE:RE:RE:how shp and pvf are connected Ecan had their wireline kit brought in fron Stephenville ready for approval being granted and they entered the well last Friday as soon as they got the can go. The word was they had milled out pretty quickly so assume that they're currently on test. I seem to remember something about a pressure depletion issue last time so its probably why theyre looking at putting a pump down there. The only current connection between NUOG and SHP is through PVF and Brian Hickey being ops for both. I don't think Brian has a holding in SHP but willing to stand corrected..