RE:RE:RE:RE:SHP getting on the radar againHi Wisecrow, I believe that the bypassed zone that George's team have identified may prove to be a quick way to get a natural flow and be connected enough to qualify as a significant discovery. I check C-NLOPB regularly and haven't seen any ripples yet but the 25th meeting could turn up something. EL1070 lower has always had potential hence the Enegi retention when SHP was after shale. ST#3 Flow test exercise to be completed after 15-30 days data collection. I think the milling out has already been completed as PVF were mobilised on site even before approval that's over ten days ago now. Pressure Data is the key and will determine the lift used, my guess would be an ESP as this was previously considered the most cost effective solution. I wouldn't worry about the natural flow its the pressure depletion and connectivity that's important, the pump will obviously be key in the management of a sustainable final flow