Join today and have your say! It’s FREE!

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Please Try Again
{{ error }}
By providing my email, I consent to receiving investment related electronic messages from Stockhouse.

or

Sign In

Please Try Again
{{ error }}
Password Hint : {{passwordHint}}
Forgot Password?

or

Please Try Again {{ error }}

Send my password

SUCCESS
An email was sent with password retrieval instructions. Please go to the link in the email message to retrieve your password.

Become a member today, It's free!

We will not release or resell your information to third parties without your permission.
Quote  |  Bullboard  |  News  |  Opinion  |  Profile  |  Peers  |  Filings  |  Financials  |  Options  |  Price History  |  Ratios  |  Ownership  |  Insiders  |  Valuation

Kirkland Lake Gold Ltd. T.KGI


Primary Symbol: T.KL

Kirkland Lake Gold Ltd is a Canada-based gold mining, development, and exploration company with a diversified portfolio of exploration projects. The production profile of the company includes the Macassa mine complex located in northeastern Ontario and the Fosterville gold mine located in the State of Victoria, Australia. Also, the company owns the Holt mine and the Detour mine. The company's mines and material mineral projects are located in Canada and Australia.


TSX:KL - Post by User

Bullboard Posts
Post by Monkeydonkeyon Aug 11, 2017 6:27am
150 Views
Post# 26569724

NEW HIGH-GRADE INTERSECTIONS EAST OF TAYLOR MINE

NEW HIGH-GRADE INTERSECTIONS EAST OF TAYLOR MINEKirkland Lake Gold Ltd. has added a new press release to its website:

KIRKLAND LAKE GOLD REPORTS NEW HIGH-GRADE INTERSECTIONS EAST OF TAYLOR MINE

TORONTO, ONTARIO -- (Marketwired) -- 08/11/17 -- 

  • Drilling continues to intersect high-grade gold-bearing quartz veins with visible gold at multiple locations east of the Shaft Deposit
    • Key intercepts: 38.0 g/t Au over 3.0 metres ("m"), 59.0 g/t Au over 0.6 m, 5.1 g/t Au over 4.4 m, 4.4 g/t over 6.2 m and 72.8 g/t Au over 1.3 m 
       
  • Drilling 200 m east of the Shaft Deposit highlights potential for near-term growth in mineral resources close to existing infrastructure (key intercept: 5.1 g/t Au over 3.4 m) 
     
  • Underground drilling intersects gold mineralization approximately 7 m west of Shaft Deposit in target area between Shaft and West Porphyry deposits. 
     

Kirkland Lake Gold Ltd. ("Kirkland Lake Gold" or the "Company") (TSX:KL)(OTCQX:KLGDF) is pleased to report new exploration drill results from surface drilling east of the Taylor Mine ("Taylor") in Northeast Ontario, and situated along the prolific Porcupine Destor Fault (the "PDF"). Recent drilling occurred along the hanging wall of the PDF, where high-grade gold mineralization has been intersected up to 1.8 km east of the Shaft Deposit, and up dip of the 1004 Deposit mineralization. The new drill results involve a total of 15 holes or 12,155 m of surface drilling, bringing total surface drill holes reported to date in 2017 to 43 holes for 22,520 m. Recent underground drilling of 14 holes for 2,500 m brings total underground drilling for 2017 to 31 holes in 9100 m. 

Tony Makuch, President and CEO of Kirkland Lake Gold stated: "The aim of the exploration work completed to date is two-fold; to discover and identify new high-grade targets for follow-up drilling and to define extensions and new mineralization at existing deposits to support increased mine life. After intersecting high-grade gold mineralization 1.8 km east of the Shaft Deposit earlier this year, we have concentrated our more recent drilling within that 1.8 km target area and today are reporting multiple high-grade intersections. These results continue to highlight the potential that exists to identify new deposits to the east of Taylor along the PDF. As well, based on recent drilling, we are increasingly confident that we can add to our mineral resource and reserves in and around the Shaft Deposit, as well as the East and West Porphyry deposits, all areas located near existing infrastructure. Currently, we have three surface drills and one underground drill in operation as we continue our work to demonstrate the expansion potential and high-grade nature of the Taylor Deposit." 

Surface Drilling Program

Surface drilling to date has focused primarily on targets east of the Shaft Deposit, where shallow dipping mineralized quartz veins situated in the hanging wall of the PDF have been intersected at multiple locations (See Figures 1 & 2). The new results being reported include a total 15 holes for 12,155 m of surface exploration. Results from this drilling support the Company's view that mineralization at Taylor remains open at depth and along strike to the east and west. 

Exploration drilling at the Taylor remains a priority for the Company with a total of three surface drills and one underground drill actively targeting mineralized extensions along strike and to depth below the 450 m level at this time. 

Highlights of surface drilling results include: 

  • 38.0 g/t Au over 3.0 m in hole TA17-085 drilled approximately 825 m east of the Shaft Deposit
     
  • 59.0 g/t Au over 0.6 m in hole TA17-041 drilled approximately 625 m east of the Shaft Deposit 
     
  • 72.8 g/t Au over 1.3 m and 8.7 g/t Au over 1.7 m in hole TA17-044 drilled approximately 525 m east of the Shaft Deposit 
     
  • 5.1 g/t Au over 4.4 m and 12.5 g/t Au over 1.3 m in hole TA17-052 drilled approximately 900 m east of the Shaft Deposit 
     
  • 4.4 g/t Au over 6.2 m in hole TA17-038 drilled approximately 625 m east of the Shaft Deposit 
     
  • 5.1 g/t Au over 3.4 m in hole TA17-042 drilled approximately 225 m east of the Shaft Deposit 
     

Underground Drilling

Recent underground exploration results from the 70 and 90 m level highlight the potential to add resources between the East and West Porphyry deposits. (Refer to Figure 3).

Highlights of the results include: 

  • 102.2 g/t Au over 0.5 m and 2.7 g/t Au over 5.8 m in hole T70-003 is located 70 m west of the Shaft Deposit
     
  • 4.3 g/t Au over 2.1 m and 3.1 g/t Au over 6.1 m in hole T90-113 identifies mineralization situated along strike and approximately 100 m east of the West Porphyry Deposit
     

The Taylor Mine is located along the PDF, a major structural feature, striking roughly east-west, dipping to the south between 40° to 60° south and globally associated with gold mineralization. Geologically, the Taylor property can be generalized from south to north as mafic volcanic rocks, which are relatively undeformed and unaltered; ultramafic and mafic volcanic rocks, which vary from weakly to strongly deformed, altered and contain felsic to intermediate porphyritic intrusions of varying shapes and sizes; and then metasedimentary rocks, which are interpreted to represent the footwall of the PDF on the Taylor property. 

Gold mineralization at Taylor is located in the hanging wall of the PDF. Four mineralized deposits have been identified over a strike length of 2 kms. From east to west these are; the Shaft Deposit, with gold mineralization associated with felsic intrusive rocks; the East and West Porphyry deposits, a system of stacked lenses, with the gold mineralization associated with felsic intrusive and altered mafic-ultramafic rocks (Green Quartz Carbonate); and the Shoot Deposit, with gold mineralization hosted by argillaceous metasedimentary rocks within a package of green quartz carbonate. Follow drilling will continue east of the shaft zone throughout 2017. Gold commonly occurs as relatively coarse-sized free gold in quartz, but also occurs as fine particles, which may be intimately associated with sulphides both in quartz-carbonate veins and in surrounding altered host rocks.

To view a PDF of the tables and figures referenced in this News Release, visit the links belowAll tables are also provided at the bottom of this News Release. 

https://media3.marketwire.com/docs/Tables_KL.pdf - Tables 

https://media3.marketwire.com/docs/Figures_KL.pdf - Figures

 
Bullboard Posts