RE:RE:New Drillship headed for GuyanaWaitingstill, I assume Tullow will be drilling in Block 54, the Araku-1 exploration well and it will take 2-4 months, rather than one. I also assume that the Tullow sites order of drilling is influenced by the order in which the 3-D is completed, And so Block 54 is ready and Orinduik 3-D is not. It seems that the 3-D is better at finding these Cretaceous fans.(where the oil is) and the 2-D indicates that there are two there, but maybe 3-D will show more fans in the Orinduik and therefor more possible drilling sites. My wishful thinking is that the economics of the much shallower Oriduick, IF it contains abundant Cretaceous oil, could be a really big big deal. rl