RE:Eco TimelinesTriple R44, I think you are wrong. As I understood it, EcoAtlantic gets a free ride on the drilling costs anywhere in the Orinduik block. The only EcoAtlantic responsibility is for 3-D seismic on 10,000 acres (about $3-4mm) and the rest of the 3-D is paid by Tullow. All of drilling costs are Tullow's. I want much to be right. rl