4 drills
4 drillsMaybe each drill average 100 feet per day or 3000 feet per month.
Reported drilling deeper holes.....that's where the 3000 feet comes from...maybe more holes at shallower depths ????
June , July , Aug would be 3 holes each at 3000 feet or a dozen holes.
I suspect it will be a mix of hole depths and more than a dozen holes from various locations.
Maybe things are good and more drills will be added.
They were planning to ramp down under the Barry pit. I wonder if that has started. It was to cut across the multiple shear zones. A test ramp for more assays. The ramp could be used to mine under the existing production pit and further develop the mine a shallow depths.
Bachelor production to be reported.