RE:RE:RESULTS/EXPECTATIONRookie not sure if you can compare GTT with Klondike. Klondike is an open pit mining operation where as GTT is deep in the ground hard rock. You need higher g/t for in ground mining as opposed to open pit. Open pit you generally want 1.5 to 2.0/GT, 5.0g/t or over would be considered excellent. The 0.5 and 0.6 for Klondikes release was to find out where the strike at lonestar ends. It's intended to be low as they want to know where to stop drilling/digging. Essentially creating a start/finish line it's interesting that the strike grew by 800m from these stepouts. A 2000m strike zone is quite big for open pitmine. The stepouts complete phase 1. Phase 2/3 are to test what is inside the strike zone (from the 0.5 to the 0.6 stepouts). In my opinion they wouldn't have brought in a second drill to test a low grade area.