Putting things in perspectivePutting things in perspective. The Gumai at the AYU location was on the edge of the Gumai structure. The ELOK well was drilled even 700 meters southwest of the AYU-1X location and still, the well encountered good oilshows en high gas readings. And the Batu Raja structure at Anggun is independent of the AYU structure targeted by the AYU-1X well !! So Repsol will drill a follow up well up-dip targeting both the Batu Raja limestone and Gumai sandstone on the Anggun structure, at some 5,6km of the AYU well. Hopefully in 2018.