In Order 4 nc-101SOI has to shore up gold deposit, thus the drilling outside main deposit The results have been but not good for stock price. My opioion is cheechoo will be a open pit mine with
10 Million ozs. Goldcorp builds 150M crusher on site and trucks to eleanore. In the meantime
we wait. NC-101 is crucial.