RE:Thanks, oilpro. Given the stellar financial metrics of theDrunk@noon, yes for the old existing vertical wells drilled through the A limestone the limestone interval can be cheaply recompleted thus capturing incremental oil reserves from a well that was already drilled. A new vertical well drilled and dedicated to producing from only the A limestone however will not be economic, as the reserve capture will be too small to justify the cost of drilling the well, hence the need for horizontals, more expensive and tricky, but much higher reserve capture. Like I said before, a very new and interesting play in Columbia.