Tonnage?Being as though numbers are being thrown around, I thought I'd try and estimate some tonnage. Obviously have to make some assumptions but based on results and the diagram, here we go.
Assume shape is a circular lens with a 50m radius and an average thickness of 10m. Specific gravity of 2.7. So calculation is 3.142 X 50 X 50 X 10 gives 78,571 cubic meters. Tonnage is therefore 2.7 X 78,571 = 212,142 tonnes.
Moving on, let's assume that the deposit is 14% CuEq and the price of Cu is $6,500 a tonne. This gives a value in the ground of 212,142 X 0.14 X 6,500 = $193 million.
This is just for the MS that has been identified by holes 4, 9 and 14.