RE:NewsWhat stands out to me is: "in a press release dated August 16, 1993 by Rio Algom on drill hole DDH 93-42 that intersected 19.9 metres grading 7.86% Zn, 3.58 % Pb, 0.33% Cu and 78 g/t Ag within a mineralized interval grading 3.38% Zn, 1.35% Pb, 0.75% Cu and 40.94 g/t Ag over 82.3 metres". Also, that is almost 2M tonnes for $2M and includes a 460m shaft.