RE:Dream of DrillingThis is at least 2nd time you’ve posted, possibly 3rd...on this topic...all times misleading...
the permission is only required for drilling from the SW from the private lands it’s right there in black and white
But 4 holes from north, and at least 1 from south and south west = at least 6 holes
quote=curious14]Read carefully what NNA wrote below:
By the way: NNA will need permission of the Landowner to get access.
Also a ruling by the BC Surface Rights Board is necessary.
Has anybody questioned Ms. Clements about this?
c14
Discussions for spring drilling 2018
Plans for the spring drill program are being reviewed, where the Blue zone will be tested from the north from two holes planned from each of the two drill pads on Crown land, and drilling south and southwest, respectively. In addition, it will include follow-up to drill test the 12S-05 intercept at depth (see NR dated Dec. 23, 2015) and, if possible, drilling two holes from the southwest from private land at about 90 degrees to 12S-05.
[/quote]