RE:RE:RE:RE:CJ's Base Drilling Program in 2018 includes 13.5 oil wells Just found it Dec 12 press release.CJ plans to drill six glauc wells in 2018.So the 18.5 well program and low cost must include the 10 strat wells we have already drilled and cost in the low hundreds of thousands.So well optimization on midale and 6 glaucs should keep our production flat.Not bad but will still wait to see if they have bantry sorted.Shane Peet got it wrong and is no longer with us.