RE:RE:RE:RE:They won't ever see the 16.5 g/TWhat you are saying is not correct, I have always been correct on this. Show me a link that leads you to think this way. Look in the sedar archive and find the Dec 2013 Snowden report, page 133, Table 15.2 where the diluted grade is listed as 15.1mt at 13.6 g/tonne. The economic projections have been based on these diluted grades, most recent being the BMO presentation of a few days ago, assume mill operates 360 days per year and recovered grade works out to 13.18, which is about same as 13.6 X 0.96 recovery.