OTCPK:MEAOD - Post by User
Comment by
BASTILLEDAY4Uon Apr 08, 2018 8:35pm
67 Views
Post# 27850495
RE:RE:barry drill results
RE:RE:barry drill resultshighlited results - MB-17-83 from 313.0 m to 322.0 m 4.8 g/t Au over 9.0 m - MB-17-88 from 473.4 m to 480.6 m 6.2 g/t Au over 7.2 m - MB-17-99 from 389.3 m to 397.5 m 7.1 g/t Au over 8.2 m - MB-17-99 from 487.0 m to 492.5 m 9.4 g/t Au over 5.5 m > Probe metals 8 Jan 2018 3.0 g/t Au over 83.1 metres starting at 7.4 metres depth, including 10.8 g/t Au over 11.4 metres, main Dyke extended 300 metres south of the former Beliveau Mine >