RE:What's the proposal production plan?I forgot to mention this in my last post: They have a lot of used mining equipement in good condition and at low cost in South Africa so Bluedust was able to buy quickly all equipement they need to rampe up the production at Oena for a large scale operation.
Samething for Tango to do that if they need more equipement. I don't know if Mr George Zard ou GZA group put money on the table to rampe up the tailing production. I hope...!
I think and it's my own opinion. Tango will have two cash flow back from their Oena mine starting in June. Be the proceeds from the sale of diamonds produced by Bluedust 25% ROM and 40% tailing and the proceeds from the sale of diamonds from the tailing stockpile 100% produce by Tango..
GLTA
Raypar