RE:NEWS: High-grade zinc intersected 240m below Perkoa mineBest mine in terms of ZN grades and ibs produced, but definitely the most expensive mine to operate, around $110 per tonne milled. However, this higher grade material will extend mine life and should help bring down costs in the long run (and they will expand on these great results). They are also installing new power sources which is expected to bring down costs $6-$7 per tonne milled.
Overall Trevali is quietly expanding its resources at all four mines. They've also increased holdings at Rosh Pinah by 10% and have the ability to increase production at both Rosh and Santandar. They are will positioned for organic growth in the next two years that can be funded by cash on hand.
Good news. Let's hope these ZN prices maintain this stability around $1.40 US. IMO this company is so grossly undervalued it's almost criminal.