RE:Bachelor production timelinepage 6:
The total tonnage processed during the three month period ended March 31, 2018, was lower by 29% compared to the tonnage processed during the period March 31, 2017. The variance was caused the lower number of mining fronts.
quarter ended:
March 31, 2018 loss $ (5,219,246)
December 31, 2017 loss $ (5,024,076)
September 30, 2017 loss $ (3,837,350)
June 30, 2017 loss $ (6,414,302)