RE:RE:Blackbird Energy Inc. Provides Operational UpdateWhat is also nice to see that BBI has already 3 pad sites acquired/ built which are within the GP city limits. So there are maybe 4-5 outer sections which are hard to drill. Overall BBI has about 110 (net) sections which can be developed. Applying conservative spacing there are over 1500 wells to drill. And this rough calculation hasn't included the Lower Montney potential. So there are decades of drilling inventory left with huge infrastructure build out coming in the near/middle term.