Third HoleWhy wasn't the third hole drilled? On the May 30 news release they wrote that they were drilling a 3 hole 1250 meter program. Instead they drilled a 2 hole 996 meter program. Eagle Plains has over $5 million in the treasury so lack of money is not an excuse. This is an absolute disgrace! 3 holes were announced and 3 holes should be drilled. Management should be embarrassed. Where is their credibility? Do the right thing and drill that hole.