RE:RE:NO where close!!!!!! The fundamental problem here is EXACTLY the same at DGC. Both operations have an ore reserve grade of close to 1 gram per tonne. I am sure some of the big heap leach operations in Nevada are successfully mining similiar low grade, but their capital costs are largely paid off.
Both these operations are showing that 1 gram per tonne is waste, if you have to repay construction costs and if you have to mine tough canadian rock rather than weak nevada leachable material, 1 gram is not ore!!!!!