RE:Waiting for flow ratesNo delay so far.
SG stated the below in a 6/27/18 interview. A month has passed since then -
Sean:
The rst one we are obviously going to go back to the Yamalick well and we would expect a month and a half from now, we could be releasing results as to how that's owing. But again we like to caution that rst well in Yamalick that we drilled was drilled as an exploration well. The fracking that we did was very small fracks at the time, just to see if we could actually recover the gas. We really hadn't expected the rates that we got and that's why we had to stop testing at the time and get the right equipment out there. So we fracked maybe less than half of the net pay in the well and then we had that aggregate ow rate, so once you get doing this in more of a production mode, we do see potential to get much higher rates there.
https://files.constantcontact.com/f5fd2524701/19f1abc7-6ff0-46ef-9341-45f7c7bd7d37.pdf