Capex 1.775 bil.This is the problem IMO, These guys need about 54000 bbl a year to keep production flat, based on 30% declines. It costs 32 33,000 per flowing that number should be 20 21,000 per flowing based on their peers. Capex is to high, they need to shave 500 mil off the number. If they can't they need to sell simple.