RE:RE:Final Voting ResultsSomeones reposting my opinions from another chat board.
Either way...the finland play looks somewhat interesting...I just never liked how they got into the project. Backroom, insider, management deals.
I will keep my eye out on the results..but so far nothing is appealing.
Now look at how they drill.
you see the first 4 holes are drilled in an tilted N/E/S/W Grid at a 45 degrees.
then they found they found the longest intersection (E) and drilled a 5th hole at a narrower dip of 80 degrees to get a 'guaranteed' longer length interection.
Just so they can tout -- "
Longest intercept in this drill program was 45m." It has nothing to do with true width/depth of the structure. It is a bit more akin to twinning a hole then anything.
ADD is near the bottom of my list of diamond stocks to buy.
Hole No. | Easting (m) | Northing (m) | Bearing/Dip (degrees) | Total Depth | From (m) | To (m) | Width (m) | Description |
GW-001 | 4470715 | 7335710 | 15/45 | 21.7 | 3.5 | 15.5 | 12.0 | Kimberlite |
GW-002 | 4470715 | 7335710 | 105/45 | 42.0 | 3.0 | 38.2 | 35.2 | Kimberlite |
GW-003 | 4470715 | 7335710 | 195/45 | 20.5 | 3.5 | 15.3 | 11.8 | Kimberlite |
GW-004 | 4470715 | 7335710 | 310/45 | 17.5 | 4.4 | 9.9 | 5.5 | Kimberlite |
GW-005 | 4470715 | 7335710 | 105/80 | 47.5 | 2.0 | 47.5 | 45.5 | Kimberlite |