RE:NEWS!!!!!So I can just assume that they couldn't believe the probes and they wanted to see with their own eyes before to come up to the world with the 43-101? :)
I do like the drilling program extension to revise later on the 43-101
Some parts I like:
GRE also visited the area south of the Project's drill holes and studied a broad region of linear surface lithium highs found by surface grid salt sampling. An NI 43-101 resource report can be expected to be completed by GRE in 3-5 weeks. Results from St-Georges tests are estimated for completion within five weeks. - at least now we have something to look for Final exploration plans are being formulated for five 90 meters (300 feet) deep drill holes to test shallow lithium-rich sediments In addition to the ongoing metallurgical work and shallow drilling the longer-term plan is to drill one deep core hole up to 1,200 meters (4,000 feet) deep to determine the vertical extent of the lithium-rich sediments. After the core hole is drilled, ten to fifteen deep mud-rotary holes, spaced roughly 1.6 km (1.0 miles) apart, are planned to greatly expand the soon to be reported resource. Olympia2 wrote: [url=https://ceo.ca/@newsfile/iconic-update-on-exploration-activity-at-bonnie-claire][/url]