Relative to re-start, keep in mind these VC & S50 hits,from Feb 2018. Since these results, Wesdome has increased from 1, to 2 drills, working S50 and VC. The VC and S-50 drill results may sometimes get overlooked, due to the spectacular Deep A results, but the VC and S-50 findings are strong in their own right. Quite close to existing mine infrastructure, they are obviously targets of the initial re-start.
VC Zone
6.68 g/t Au uncut (6.02 g/t cut) over 37.6 m core length (6.1 m true width) in hole 6187 VC6 Including 10.01 g/t Au over 20.5 m core length (8.8 g/t cut) VC6
6.61 g/t Au uncut (5.15 g/t cut) over 17.0 m core length (6.0 m true width) in hole 6191 VC6 Including 34.83 g/t Au over 2.3 m core length (24.0 g/t cut) VC6
98.51 g/t Au uncut (19.63 g/t cut) over 3.0 m core length (2.2 m true width) in hole 6228 VC1
8.07 g/t Au uncut (8.07 g/t cut) over 6.8 m core length (4.7 m true width) in hole 6231 VC6
S-50 Zone
17.89 g/t Au uncut (16.3 g/t cut) over 6.0 m core length (5.0 m true width)in hole 6190 S-50
4.68 g/t Au uncut (4.68 g/t cut) over 13.2 m core length (1.1 m true width) in hole 6211 S-50
18.5 g/t Au uncut (18.5 g/t cut) over 0.7 m core length (0.3 m true width) in hole 6222A
These are in addition to 2017's 262 g/t over 5.6m true width, from the VC zone.