RE:RE:sorry to disappoint the bearsThanks for the reprint of This Q&A answer. A 40% increase in mill throughput on a consistent basis is based on a much more difficult problem-getting the tonnage of average mine grade material to the mill. Ovseneks answer outlines the steps necessary and gives us an expected timeline for completion of the project. It is comforting to have a mill that can proces the tonnage without major modification but the amount of both development work and definition drilling will probably result in somewhat higher rather than lower AISC. I am optimistic that the VOK resource estimate will have a larger inferred number as it means that for the minelife to be restored to 18 years there will need to be an extensive and ongoing diamond drill program. Overall this a great start to 2019 and with the world heading for a bit of a recession it can be expected that the price of gold will strengthen
and the revenues will look even better.