RE:RE:A joke of a companyyes, very nice to see Cristiano respond on the margin issue so promptly and confirm that going forward the pfs should be the guide for operating costs this year.
so if 200k tons are produced and sold in 2019 that would peg revs at about 9M and with the 14.53 per ton phase 1 operating costs, production costs should be closer to 3M, SG&A will probably bump up to 2.5 - 3M. All speculation at this point but if the demand build is truly coming online then this year could truly be pivotal.