RE:RE:RE:Update with SteveHi Firecraker or anyone else,
I believe Tenacious is correct. Don't confuse the total tonnage of Zinc Concentrate and Total Zinc Metal. The zinc concentrate is typically about 50%, so the total concentrate will be double of total zinc metal production.
TV's Zinc forecast is 163K to 181K metal production (100%), so the concentreate will be 326K to 362K. That's the amount of material to be treated.
This link is excellent for understand metal revenue, treatment charge, etc. from DougBeattie, I posted the link in the past.
tiger
https://www.docdroid.net/MfN8HxV/module-1-how-much-is-the-ore-worth.pdf
firecracker74 wrote:
Tenacious, where did you get the 400,000 tonnes of concentrate number? If that number is correct then the extra cost to TV would be more like $40M and would add .10 to AISC.